Install zee closures onto panels at both sides.
Roof edge drip standing seam.
Fasten with appropriate substrate fastener at minimum 4 fasteners per zee or 3 inches on center.
Install additional sections of hip ridge flashings with minimum 4 inch end laps and tube sealant at laps.
Applied with metal and standing seam roofing an open hemmed drip edge will deter water from going upward as a result of capillary action and passing the drip edge metal.
Versatile compact 24 inch 61cm drip edge folding tool makes quick bends along the drip edge of flat pan standing seam metal roofing panels.
Two rib reinforced steel plates are permanently welded together to create two folding seams for making 1 inch 25 4 mm and 1 1 2 inch 38 1 mm deep bends in maximum 22 gauge 0 76 mm steel.
Rivet hip ridge flashing to top flange of zees at 18 inches on center both sides.
The drip edge system includes a continuous 22 ga steel cleat with roof flange for easier installation and is pre punched with slotted fastener holes.
Utilized on low incline roofs l shape drip edges are situated on the roof deck and atop the fascia board.
Use hip ridge flashing to locate correct position of zee closures.
Standing seam standard drip edge lip is 1 25 shingles is 1 so it s not the drip edge itself gutters need to be tucked under drip edge lip so that water doesn t flow behind gutters.
Apply a row of tube sealant along back face of zee closure adjacent to panel legs.