It is common for rafter ends to be damaged and fascia boards to be missing or damaged.
Roof gutter installation details.
While it makese sense to slightly slope the gutter toward the downspout about 1 4 in.
Gutters are often installed level for appearance.
The drip edge should be installed on top of the underlayment at all rakes and below or on top of the underlayment at the eaves.
Install roof ventilation a roof vent installation kit will provide everything you need to vent your roof in one convenient package.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Allow space for the edge of the vent opening where it will rest on the roof.
Installation typical gutters to begin slip the back edge of the micro mesh gutter filtration panel underneath the first shingle of the roof.
With help lift the gutter in place and secure the corner first screwing the bracket into the roof s fascia.
Secure the rest of the hangers with 2 in galvanized nails or screws.
Picture k style gutters are the general standard in the usa.
When installing gutters set the proper slope by driving a nail 1 2 in.
When determining the placement of the roof vents measure the vent housing and mark off the space on the roof.
Rafter ends must be repaired and fascia boards replaced as needed.
If you have one of the other gutter types be sure the gutter protection system can be installed to it.
Below the shingles on the high side of the gutter run.
Ice dams can also occur on metal roofs and can cause damage.
Measure and record the distance from the bottom of the fascia board to this nail.
Download free high quality cad drawings blocks and details of manufactured gutters and downspouts organized by masterformat.
When roofs are in poor conditions repairs should be made by the landowner before any recommendations to install roof gutter are made.
This old house recommends that gutters should slope inch for every 10 feet toward a downspout.
The brackets are fastened to the wood fascia by two brass screws.
Copper braces at the midpoints between the brackets.
This keeps water moving away from your roof.
A continuous copper apron strip extends onto the roof a maximum of 4.
At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required.