Secure the cable to the shingle with one of the provided cable clips.
Roof heat tape instructions.
Measure horizontal roof sections depth of overhang length of each dormer and and length of each downspout.
By applying heating cable from the roof edge to a level just above the overhang and in the gutter and downspouts melt water on the roof will have a clear drainage path.
Wipe the surface making sure there is no foreign.
Starting at the bottom left or right edge corner of the surface near the gutters apply clips to the third or fourth row of shingles approximately eight to twelve inches apart.
208 subscribers step 1.
Connecting your heating tape to a.
To install roof heating cables you must first apply shingle clips to the structure.
Use the included instructions download here to calculate exactly how much roof de icing cable you need to buy.
Install roof heater cables when it s dry outside and it s safe to do the work from a ladder.
Heating tape installation wrap heating tape can be installed on nearly any surface due to its flexibility.
Pipe surface preparation prepare surface to be heated.
If two cables are required position them in the 4 and 8 o clock positions.
Route the cable from the electrical outlet to the starting point on the roof.
Wrap easyheat hca optional application tape or nylon cable ties at 6 15 24 cm intervals to secure the heating cable to the pipe.
If the heating cable is the same length as the pipe run it straight along the bottom of the pipe.