Keep your nails on either side of the gap and away from the middle of each individual shingle so that the gap in the shingle above doesn t expose the nail head.
Roof nailing pattern tji.
Do not walk on joists that are lying flat.
Nail with 1q 1od nalls bearing blocking rim joists header opening with double tji joists load bearjng wall above must stack over wallbelc wl micro lam l v l.
Position the nails appropriately according to the shingle installation instructions.
Our most versatile beam solution.
Align shingles properly to avoid nail exposure.
Stack only over beams or walls.
Roof framing tji 110 tji 210 tji 230 tji 360 tji 560 joists warning.
Properly fasten panels including fastening and spacing hints.
A roofing nail should have a minimum nominal shank diameter of 12 gauge 2 67 mm and a minimum head diameter of 9 5 mm.
Tj 9510 installation guide for floor and roof framing with tji s31 s33 and s47 joists east canada.
Csg tjcan12 simpson connector guide for trus joist products.
Do not walk on joists until braced.
With tji joists z rwm 9 112 and 11 718 4 with 14 and 16 tji joist kerblock.
Follow these five simple construction steps for roof sheathing and scroll down to see more details on each with installation hints and tips below.
Tj 9001 installation guide for floor and roof framing with tji 110 210 230 360 and 560 joists.
Check the nailing surface is level.
Red dots mark the nail holes for a 6 nail high wind nailing pattern on traditional 3 tab shingles note that the nails are just below the tar line.
Rim board to tji joist 10d 0 131 x 3 one into each flange toe nail 10d 0 131 x 3 6 o c.
For duration series shingles owens corning recommends using either a 4 or 6 nail fastening pattern depending on the roof s slope and building code requirements.
A large nail head and heavier shank gauge provide greater holding power.
Do not stack building materials on unsheathed joists.
Roofing nail should have a barbed shank until the head which eliminates nail pops blow offs and roof leaks.
Ventilate the roof according to current building codes.
In most cases 4 nails are adequate.
Tji joist to plate 8d 0 113 x 2 two nails driven at an angle into bottom flange one each side of web at least 11 2 from end.