Have one person lay shingles in the proper place and another person nail shingles down.
Roofing felt how to hipped roof.
The first step in the process of erecting the hip roof is to get the ridge beam into place at the top of the roof.
More information on tyvek roofing membranes http www con.
Roofing felt comes in rolls that feature pre marked lines 2 to 3.
Installing the roofing felt does take care but can go very quickly.
The second step involves placing the first shingle on your roof.
Use two stacked shingles cut to form to start the ridge cap at the bottom of the hip ridge and then use one cap in each position up the ridge.
Place the 4 6 common rafters in their designated positions along the 2 longest walls and nail them firmly to the wall with a nail gun.
Position the first row of roofing felt flush on the bottom with the edge of the gutter apron.
Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive.
Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.
If you want to keep your roof from getting potential water damage then you need to start your roofing project by adding flashing to the ridges and by adding strips of tin to the edges of your hip roof.
When installing anything on a roof you need to follow the water rule the water rule means you consider where water will run when it s on the roof.
The reason why drip edge should be installed below the underlayment along the eaves of the roof is so that water does not get under the drip edge.
Start at the bottom of one side of the roof at the right or left edge.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
How to lay roofing felt on a hip roof.
Attach 4 6 centering rafters and lift the ridge beam into place.
Get some friends to help you shingle the hip roof.
This needs to be done in a way which would allow the bottom of the shingle to lie even with the bottom edge of the hip roof.
Taking the time to properly prepare the sheathing will make all the difference in how quickly and easily the felt paper is installed.